https://assign.jobotai.site/#/

← العودة
Blog Post

عنوان المحادثة: https://assign.jobotai.site/#/

التاريخ: 01.05.2026 - 30.04.2026

التصنيف: 🧠 الذكاء الاصطناعي وتعلم الآلة

إجمالي الرسائل: 6 | ياسر: 5 | M: 1

Yasser
>>> hello how are you?I am doing well, thank you for asking! As a large language model, I don't have feelings, but I am functioningperfectly and ready to assist you.How are you doing?
Yasser
Error: 500 Internal Server Error: model requires more system memory (9.8 GiB) than is available (9.7 GiB)
Yasser
🛡 الحماية اللي اتفعلت:fail2ban شغال → 4 IPs اتبنت فوراًSwap file 4G اتعملaffiliate.service (restart loop) اتوقف
المحادثة الكاملة - 01.05.2026 - 30.04.2026
M
My agent sent me thisMira — You clearly understand construction takeoff, but the current direction is wrong. We do not need more one-off prompts or hardcoded scripts. We need a repeatable workflow that can run on new projects and produce trustworthy estimate line items.For your next submission, focus on ONE clean end-to-end pipeline:1. Input: project drawings/specs/PDFs2. Extract: sheets, schedules, legends, room finish schedules, notes, dimensions3. Normalize: one consistent JSON schema for estimate line items4. Calculate quantities only when supported by source data5. Leave quantity null when it cannot be proven6. Validate against the expected/sample outputs7. Report gaps, assumptions, uncertain items, and next improvementsImportant: do NOT hardcode the Maryland Vision Institute project, page numbers, or project-specific facts. You can use them as test data, but the solution must generalize.Your submission must include:- Repo or zip file- README with exact setup/run commands- Sample outputs for all provided projects- Short architecture explanation- Evaluation table: expected vs found, missed items, false positives, confidence- Your recommended next 3 improvements if hiredWhat I am evaluating:- Can it run end-to-end?- Does it produce complete estimator-style line items?- Does it avoid hallucinated quantities?- Is the architecture reusable on new projects?- Can you explain the tradeoffs clearly?This does not need to be a perfect estimator in 12 hours. It needs to prove you can build the right foundation, think clearly, and communicate clearly.
30.04.2026 23:10
ياسر
حطي subdomain
30.04.2026 23:18
ياسر
https://assign.jobotai.site/#/
30.04.2026 23:35
ياسر
>>> hello how are you?I am doing well, thank you for asking! As a large language model, I don't have feelings, but I am functioningperfectly and ready to assist you.How are you doing?
30.04.2026 23:45
ياسر
Error: 500 Internal Server Error: model requires more system memory (9.8 GiB) than is available (9.7 GiB)
30.04.2026 23:46
ياسر
🛡 الحماية اللي اتفعلت:fail2ban شغال → 4 IPs اتبنت فوراًSwap file 4G اتعملaffiliate.service (restart loop) اتوقف
01.05.2026 00:01
← العودة إلى الرئيسية